Hi everyone,
I’m currently designing a tether winch system for an ROV, and I’m looking for some advice from people who have experience with ROV tether management or winch systems.
The main goal is to continuously measure the tether tension and use the measured tension to automatically control the winch. For example:
- If the tether tension becomes too high → the winch should pay out some cable.
- If the tether tension becomes too low → the winch should reel the cable in.
- The system should maintain the tether tension within a defined range.
My main question is about the mechanical arrangement for measuring the tether tension.
Where is the best place to install a load cell or tension sensor in the tether path? I’m considering different arrangements such as a dancer/tension arm, pulley/sheave with a load cell, or an inline tension load cell, but I’m not sure which approach is most suitable for an ROV tether.
I’d also appreciate advice on:
1. What type and capacity of load cell would be appropriate?
2. Where exactly should the sensor be positioned relative to the winch and guide rollers?
3. What mechanical mechanism would you recommend for transferring the tether tension to the load cell?
4. How can I avoid introducing excessive friction or damaging the tether?
5. How should the tension measurement be integrated into the winch control system?
6. Are there any practical issues such as vibration, dynamic loads, cable movement, or sensor protection that I should consider?
If anyone has built or used a similar ROV tether tension monitoring/control system, I would really appreciate hearing about your design, especially any photos, diagrams, or lessons learned from your experience.
Thanks in advance for your help!